The works involve the replacement of over 1.4km of problematic water mains with new modern pipes. The programme to replace the water mains in Slieverue, Co. Kilkenny. These works are being carried out as part of Uisce Éireann’s National Leakage Reduction Programme on behalf of Shareridge.
Scope of GDI activities:
- HDD
- Rock breaking for watermain installation
- Back yard service installation
- Hydrotesting
- Watermain installation
- 1km of 225 HDPE watermains
- 0.4km of 150mm HDPE watermain
- Tie in to 600 dia watermain
- Traffic management
- Temporary road reinstatement
Problems that we solved thanks to the experience of our employees
- Coordination of multiple shut down connections
- Repeated failures of asbestos main required section handover
- Property surveys to optimise backyard service routes
- Liaison with local community to minimise disruption